BOG recovery into LNG storage tank
■ Applicable LNG filling station, L-CNG filling station, LNG storage station, LNG peak shaving station, LNG gasification station and recovery of residual pressure BOG after unloading of LNG tanker.
■ Features New Product of Anhui Province
Equipment in Recommended Catalogue of Energy Conservation and Environmental Protection in Anhui Province
Equipment Parameters
|
Medium
|
Treatment capacity Nm3/h
|
Inlet pressure (Mpa)
|
Exhaust pressure (Mpa)
|
Motor power KW
|
Overall dimensions (mm)
|
ZW-1.5/(1-4)-6 |
Low temperature BOG |
300 |
0.1-0.4 |
0.6 |
18.5 |
1500*1500*1700 |
ZW-2.0/(1-4)-6 |
Low temperature BOG |
400 |
0.1-0.4 |
0.6 |
22 |
1500*1500*1700 |
ZW-3.0/(1-4)-6 |
Low temperature BOG |
600 |
0.1-0.4 |
0.6 |
30 |
2000*1600*2000 |
- Previous:BOG recovered into pipe network
- Next:CNG from BOG recovery